This large
detention
pond in
southern
Mississippi
was
overwhelmed
with dense
trees,
brush,
trash, and
nuisance
vegetation.
Our
technicians
removed all
of these
items,
allowing the
pond to
function
properly. It
is now on a
routine
maintenance
plan and the
parking lot
that drains
to it no
longer has
flooding
problems. |
| |
|
| |
|
| |
|
|
|
This
detention
pond near
Houston, TX
had severe
erosion on
its west
slope.
Topsoil was
hauled in
and the
slope was
regraded and
compacted in
the eroded
areas. Once
the correct
elevation
was
achieved,
the slope
was then
hydroseeded. |
| |
|
| |
|
| |
|
|
|
A hydraulic
leak from a
trash
compactor at
a retail
store in
Louisiana
caused
concern
because it
was leaking
into the
swale behind
the store.
Our
technicians
placed booms
to contain
the spill
and prevent
further
runoff into
the pond.
Using a hot
high power
washer with
a waste
water
recovery
system, the
oil and
contaminants
were lifted
off of the
pavement. |
| |
|
| |
|
| |
|
|
|
Technicians
are seeding
the slopes
of a large
retention
pond in the
San Antonio
area.
Hydroseeding
prohibits
the seed
from moving,
therefore
allowing
faster
germination.
These photos
were taken
just 2
months after
seeding. |
| |
|
| |
|
| |
|
|
|
This sand
filter bed
in Austin,
TX was no
longer
functioning
properly so
a full
remediation
was
performed.
The filter
bed and
adjacent
area were
pumped dry
and the
contaminated
filter
material was
removed and
hauled to an
approved
disposal
site. Larger
pvc pipes
were
installed to
replace the
smaller,
incorrect
pipes and
new gravel
screens were
installed.
The gabion
rock beds
were
disassembled,
cleaned, and
then
replaced.
Proper
geotextile
material,
gravel,
filter
fabric, and
filter sand
were also
replaced. |
| |
|
| |
|
| |
|
|
|
Erosion has
been slowly
developing
on the
slopes of
this
detention
pond in
Arkansas.
Erosion
control mats
were placed
on the newly
compacted
topsoil to
allow seed
to
germinate. A
month later,
the grass
has already
begun to
fill in the
repaired
area on the
slope. |